Skip to content
Ch. 558 / 1000

My Summons Have Day Jobs: The Courtesy Bridge of Lowbank • Season 12

Chapter 558: The Archival Ledger Reorganized

Early access · free on June 8, 2027Loading chapter…

By three in the afternoon, the cooperage loft had been converted into an orderly town archive. Corvin had spent five hours scrubbing down four oak flour bins with vinegar, lining them with dry straw and oilcloth, and arranging Hal Rook’s forty-two handwritten service folios in chronological set.

On the white-washed timber wall, Corvin had pasted a massive master index drawn in red and black ink. Every flood, every weir repair, and every underground under-road drain digging dating back thirty-five years was indexed with cross-references to the current pressure readings Ada was feeding across the Courtesy Bridge.

‘Look at this pattern, Pella,’ Corvin said. She pointed with a bone paper knife to Volume Fourteen. ‘In Year Minus-Twelve, during the midsummer freshet, Hal recorded a sudden three-foot drop in the Upper Tor pool that was not with an outflow at the weirs. He spent two weeks searching the bluffs and found an underground sinkhole behind the limestone quarry.’

Pella climbed the ladder to examine the entry. Her father’s neat, sloping handwriting was with a careful watercolor sketch of the quarry wall, showing a natural fissure six feet wide where the water was disappearing into the bowels of the mountain.

‘He marked it with an iron benchmark,’ Pella read aloud. ‘Benchmark Fifty-Four. He warned that if the quarry bypass was ever high-pressure, the water would force that fissure open and wash out the entire western levee.’

Unlocks free on June 8, 2027

At 00:00 UTC

New chapters unlock free every day. Subscribe to read ahead, or unlock every chapter to the ending.

Unlock every chapter · $10/month

Every chapter, all the way to Ch. 1000.

One plan covers every novel on the site.

Or read ahead to Ch. 200 for $5/month

Already subscribed? Sign in