Skip to content
Ch. 902 / 1000

My Summons Have Day Jobs: The Courtesy Bridge of Lowbank • Season 19

Chapter 902: Framing the Timber Cradle Sled

Early access · free on November 27, 2027Loading chapter…

Down on the narrow western upkeep ledge, eighteen feet below the howling storm, Eren Tal was finishing the assembly of the rescue sled. The wooden cradle was six feet long and three feet wide, framed from two twelve-foot seasoned ash runners that he had salvaged from Tom Carver’s timber yard. The runners were curved upward at both ends like an upland snow sled, planed smooth as glass and greased with thick sheep fat to slide effortlessly over the cold granite coping.

“Hand me the hickory pins, Will!” Eren shouted over the thunder of the spray. Young Will Carver reached into the tool chest. He passed four seasoned hickory pegs that Eren drove home through the mortised cross-stretchers with three sharp taps of his copper-faced mallet. The joint drew together with an airtight, creak-free snap that spoke of master wheelwright field skill.

Inside the wooden box, Dima was laying down three thick layers of washed sheepskin felt, covering them with a sheet of tarred linen to keep out the freezing river spray. At each corner, heavy forged iron eye-bolts were bolted through the ash frames. It was backed by three-inch square washers of cold-rolled plate. “She’s solid, Eren,” Dima called out, pulling on the corner sling with both hands. “She’ll carry two men and an iron screw-jack across that deep gap without deflecting a quarter of an inch.” Eren wiped stone dust from his beard and nodded. The cradle was ready to fly.

Unlocks free on November 27, 2027

At 00:00 UTC

New chapters unlock free every day. Subscribe to read ahead, or unlock every chapter to the ending.

Unlock every chapter · $10/month

Every chapter, all the way to Ch. 1000.

One plan covers every novel on the site.

Or read ahead to Ch. 200 for $5/month

Already subscribed? Sign in