Skip to content
Ch. 313 / 520

Frontier Architect: My Blueprints Build Empires • Season 8: The Deep-Core Excavation

Chapter 313: The 10-Mile Breakthrough

Early access · free on February 6, 2027Loading chapter…

Civil public works transformed hostile geographical voids into orderly town real estate.

At Milepost Ten point zero, fourteen thousand two hundred feet below the snowy peaks of Haven-Hold, Giles Croft stood at the edge of the newly completed portal.

He held a six-foot boxwood folding rule in his hand, checking the posture of the final load-bearing tunnel ring.

The twenty-five-foot circular bore of the Great Underground Tunnel stretched ten nonstop miles behind him.

Seventeen thousand six hundred segmented steel and water-setting concrete liner rings formed an unbroken, dry, lit up channel through the mountain’s deepest granite roots.

Each ring was bolted with twelve one-inch heat-treated alloy bolts, torqued to four hundred foot-pounds and sealed with vulcanized EPDM rubber rings that held back two hundred pounds of pressure of water-pressure rock pressure.

The double-track Bessemer steel railway gleamed under overhead carbon-arc lanterns. He carried fresh air-flow air and spark power straight from the surface foundries.

The rails were nonstop-welded using potion-made fire-powder charges, fully eliminating joint gaps.

Unlocks free on February 6, 2027

At 00:00 UTC

New chapters unlock free every day. Subscribe to read ahead, or unlock every chapter to the ending.

Unlock every chapter · $10/month

Every chapter, all the way to Ch. 520.

One plan covers every novel on the site.

Or read ahead to Ch. 200 for $5/month

Already subscribed? Sign in