Skip to content
Ch. 396 / 520

Frontier Architect: My Blueprints Build Empires • Season 10: The Continental Subsea Line

Chapter 396: Sister Teresa’s Marine Salve & Sluice Relocation

Early access · free on March 19, 2027Loading chapter…

Forty cubic miles of seawater are removed from a basin forty miles wide. Then, the result is not an instant garden.

It’s a huge, stinking desert of grey marine silt drying under a blazing sun.

Giles Croft stood on the timber tailgate of an all-wheel-drive steam tanker truck, his rubber boots planted firmly in the newly steadied crust of District One.

The basin floor, three thousand five hundred feet below sea level, was warm, windless, and thick with the heavy scent of drying minerals and crystal-hardened salt water.

Around the truck, four heavy rotary sprinkler heads were spinning at two hundred turns a minute, throwing wide, overlapping arcs of amber liquid across fifty yards of drying mudflats.

Beside Giles, Toby Karr was testing the surface crust with a pocket penetrometer.

“Surface shear strength is two point four tons per square foot, Master Giles,” Toby called out, reading the tuned spring dial.

“The soil polymer has pierced four inches into the silt layer. The crust is holding.”

Unlocks free on March 19, 2027

At 00:00 UTC

New chapters unlock free every day. Subscribe to read ahead, or unlock every chapter to the ending.

Unlock every chapter · $10/month

Every chapter, all the way to Ch. 520.

One plan covers every novel on the site.

Or read ahead to Ch. 200 for $5/month

Already subscribed? Sign in